A couple of years back a friend called and asked me about his idea of attracting more ducks to his farm. “All we need to do is build a levee across that little slough near Pine Creek.” It sounded like a good idea but I told him there may be a hoop or two to jump through. You cannot block or dam a creek, particularly if the stream is marked on a USGS map as a “blue line stream.” That’s because any work occurring in the floodplain of a stream potentially falls under the jurisdiction of the U.S. Army Corps of Engineers. 

As my friend said, “Even on my land?” Yes, because everything you do on or near any floodplain can potentially affect not only the wetland habitat on your land but on all the land downstream from your location. 

Anticipating and constructing a new waterfowl impoundment always brings visions of morning skies filled with ducks and geese, but actual planning prior to starting might be frustrating, to say the least. It’s not just scheduling earth moving equipment; but knowing who you are required to contact for permitting and which agencies are responsible. 

Bulldozer creating a levee for a waterfowl wetland

404 Permit

Developing a project on a floodplain is going to require a 404 permit which states this key point; Section 404 of the Clean Water Act regulates the discharge of dredged or fill material into waters of the United States, including wetlands (this includes fill for development and water resource projects such as dams and levees).

Depending on the size and location of your project, several options are available for landowners to start the 404 process through state and federal agencies. Many state wildlife agencies have biologists who work with landowners interested in developing wetlands - and don’t overlook organizations like Ducks Unlimited who have staff biologists. There are also private wildlife/wetland consultants who can direct the project from start to finish. 

The Natural Resource Conservation Service (NRCS) has offices in most counties across the country and can provide technical advice on building levees.

Some landowners prefer the “do it yourself” approach, but going DIY on a 404 application requires attention to details and carefully following instructions before you submit your application. Most of the regulatory staff cover large areas with heavy workloads. Having a carefully planned application makes their job easier and will help speed up the process. 
 

Section 404 Permit Process

First, you need to determine which Corps District your project is located in because across the 21 Districts there are slight variations on permitting. To find your district visit the US Army Corps of Engineer Website

Tim Flinn; Eastern Section Chief with the US Army Corps of Engineers told me the first questions we ask are obvious; where is the site, how large is it, is it on a floodplain? Flinn suggested that if you have a sizable project “it may be best to hire a consultant who is versed in wetland projects” and can get through the steps. Flinn added; “There are a lot of wetland consultants out there who can furnish technical guidance for these type projects.”

For the DIY person, I have found Corps staff helpful, but the permit process will run smoother if you review the “instructions for preparing an application.” Most questions are easy; who, when and where, but pay close attention to questions on “Nature of Activity.” Here you need to describe where the building material (soil) is coming from and going to, as well as the size (height and length) of the levee. The permit also requires drawings. Good news, you can hand draw one on paper. Just make it clear and precise. Again, there are examples on the website. 

Installed Watervalve for the regulation of waterflow
 

Determine the Total Cubic Yards of the Levee

Once you know the size of the levee there are conversion charts on the internet to calculate cubic yards of material that you will move. “Total cubic yards” is an important number and although it does not need to be exact the estimate immediately helps engineers determine the magnitude of the project when your application arrives at the Corps office. Just remember as the levee height increases so does the complexity of the project. 
 

Provide a Map

The application needs a map and Google Earth works perfectly. The toolbar setting allows you to sketch the outline of the impoundment, levee location and where soil will be taken from. A second map should be on a smaller scale showing site in relation to nearby towns and other features. Attach your hand drawing here showing levee design including height, slope, length and location of the water control structure.
 

Map needed for the 404 permit

Section 404 Permit Requirements

Very often, mitigation or replacing lost habitat is required due to the project changing elevations on the floodplain. Obviously adding fill at the levee changes elevation. It has been found that an elevation change of only one foot in a floodplain could alter plant composition and habitat. 

If mitigation is required, you may be able to mitigate your project on your land which is the most economical way. An example would be replanting trees on a portion of bottomland where a forest was cleared for farming. Restoring this small amount of farm ground not only offsets the disturbance but provides habitat for waterfowl, deer, and turkey. If you do not want to mitigate on your land, there are “Mitigation Banks” where you pay someone to restore land at another location. Again, before you start in this direction you must have an approved mitigation plan describing how you will restore and replant the site. For mitigation projects, it is highly recommended that you hire a consultant to walk you through this process. 

I asked Flinn a common question I often hear; “why mitigate a wetland when you are constructing a wetland”? Flinn told me the Corps understands that you are putting in a wetland. However, it will only be wet a few months each year. Because of its temporary nature, additional measures are needed so there is not a total loss of wetlands. Back in the 1990s, President Bush signed an order so from that point on there would be a “no net loss of wetlands.” Mitigation is the tool that assures our remaining acres are retained. 

Another situation you may encounter, the Corps requires that more acres be mitigated than are being altered. If landowners construct levees in a forested habitat where older trees are removed, the additional acres of young trees offset the loss of mature trees. This mitigation is generally for the area where permanent fill (levee) is placed in a wetland. 

The Corps may also add stipulations to your permit. For instance, when constructing a Green Tree Reservoir (GTR), you might be required to break the impoundment up into three separate units. Each year one unit remains dry. These types of rotations are a normal management practice for GTRs. Research has shown that woodlands that are flooding continuously each winter are not as healthy as those with occasional dry periods through winter months. 
 

Flooded Timber

Using a District Conservationist

If all of this sounds rather difficult remember you are only a few minutes away from your local Natural Resource Conservation Service (NRCS) office. At each office, you will find a District Conservationist or DC who can walk you through the process. Chase Coakley; the NRCS Area Resource Biologist in Tennessee told me that practices and assistance are available to everyone, but programs and assistance do vary per locality. 

Each DC has their own line of expertise but if they are not familiar with designing wetland projects, they have access to other NRCS professionals including engineers, soil scientists, and biologists who can help complete a project design.

Using the NCRS Office

When you visit an NRCS office the DC will review objectives and location maps as well as soil capabilities and watershed information. At this point they will advise you about the technical assistance NRCS can provide and even if cost-share assistance is available. Coakley told me, “There are sometimes separate pools of money that help underwrite projects, but this varies state to state and year to year.”

After the office visit, the DC will make a site visit when making the final determination of the project. If the DC feels that additional expertise is needed, they will schedule an NRCS engineer or biologist to help determine if the project will be a viable wetland for waterfowl.
 
Next is the permitting process and here is the big plus for going to the NRCS. If cost share assistance is being used, NRCS will take the lead on the 404-permitting process. Coakley added, “If it is only technical assistance such as providing a design or management information we can still offer that service of helping landowners go through the permitting process.” 

Although the NRCS is a non-regulatory agency and everything you do with them is on a volunteer basis, you still need to be aware of compliance issues. If you are farming and receive USDA benefits you must comply with rules. For instance, if you decided to clear a woodland to construct a wetland that would potentially have a commodity crop planted on it you need to have NRCS evaluate the site. Additionally, if you are going to construct your impoundment on existing pasture or cropland you should get approval on current wetland provisions. 

If you are a new landowner or have never worked with the NRCS before, Coakley suggested going to the Farm Services Agency (FSA) to get farm records established. FSA will check your eligibility and create a farm record. 

Additionally, if you construct the levee with government funds there may be some guidelines you need to follow. An example might be only planting a portion of the impoundment to crops such as corn or milo each year. The remaining portion would be moist soil or native wetland plants such as millet. Again, these recommendations will vary from region to region. Other management guidelines could specify the timing of drawdown to assure the impoundment has water at critical times such as spring migration periods. 
 

The Application is Worth the Ducks

Why all the fuss? Well over most of the U.S. many states have lost over 95% of their original wetlands. President Bush signed the order for a no net loss of wetlands at a critical time and every remaining acre is important to the waterfowl and other wildlife species we all enjoy. These regulations assure we will maintain this habitat for years to come. 

Working on 404 applications takes time and you will find it is easier to start right than to have to back up and start over! Allow time to obtain the permit and with proper planning and design, you will see those flights of ducks when first light begins to brighten the morning sky!